Workflow
交通“大动脉”“微循环”更加畅通 前三季度跨区域人员流动量超五百亿人次
Ren Min Ri Bao·2025-11-04 22:03

Group 1: Transportation Infrastructure Development - Major transportation projects are progressing rapidly, with the world's largest cable-stayed bridge, the Yanqi Yangtze River Bridge, expected to complete its main span by November [1] - The Xinjiang Wuwei Expressway, spanning 319.7 kilometers, is nearing completion and aims for full operation by the end of this year [1] - The total investment in transportation fixed assets reached 2.6 trillion yuan in the first three quarters, with significant contributions from highways, railways, and waterways [1] Group 2: Personnel and Freight Movement - Cross-regional personnel flow reached 50.6 billion trips in the first three quarters, a year-on-year increase of 3.1% [2] - The total freight volume grew to 43.25 billion tons, reflecting a year-on-year increase of 3.89% [2] - Port cargo throughput increased by 4.6% year-on-year, with foreign trade container throughput showing resilience with an 8.4% increase [2] Group 3: Innovations in Logistics - The "One Bill" system has streamlined logistics processes, significantly reducing costs and improving transport efficiency for exports from Yiwu [3] - The Ningbo-Zhoushan Port has launched 111 container sea-rail intermodal routes, achieving over 1.5 million standard container units in sea-rail intermodal business [3] - The Ministry of Transport plans to enhance the integration of container sea-rail intermodal transport, targeting an annual growth rate of approximately 15% by 2027 [3]