Core Points - The Prenj Tunnel project in Bosnia and Herzegovina has entered the final stage of its preparation, marking it as the largest and most technically demanding project along the 5C corridor in the country [2] - The total investment for the tunnel is approximately €600 million, with financing provided equally by the European Bank for Reconstruction and Development and the European Investment Bank [2] - Upon completion, the tunnel will reduce travel distance between Sarajevo and Mostar by about 30 kilometers, which is nearly one hour [2] Summary by Sections - Project Status - The tunnel's land acquisition announcement has been published, and the bidding process is in its final stages [2] - The first phase of bid evaluation is expected to be completed by March 2025 and will require approval from the European Bank for Reconstruction and Development [2] - The selection process for supervision is progressing simultaneously, with technical assessments already approved by the bank [2] - Technical Details - The tunnel will have a total length of 10.45 kilometers, situated within a highway segment that is 12.2 kilometers long [2] - The design includes a dual-tube structure equipped with an intelligent traffic management system [2] - The estimated construction period for the project is at least six years [2] - Strategic Importance - The completion of the tunnel is expected to enhance Bosnia and Herzegovina's position as a strategic hub between Central and Southeast Europe and the Adriatic Sea [2]
波黑普雷涅隧道工程招标程序进入最后阶段
Shang Wu Bu Wang Zhan·2025-11-06 03:45