Core Insights - The project focuses on developing a renewable energy base in the harsh environment of the "Shagohuang" region, which includes desert and Gobi areas rich in wind and solar resources [1][3] - The construction of a "small green grid" using solar power and energy storage has enabled the project to achieve 100% self-sufficiency and low-carbon operations [2][3] - The project has transformed a previously neglected area into a modern energy oasis, showcasing China's rapid energy transition and leadership in renewable energy [3][4] Group 1 - The "Shagohuang" region is characterized by extreme weather conditions, with high temperatures in summer and severe cold in winter, presenting significant challenges for construction [1][3] - The project includes a 2×1 million kilowatt coal power project and a 6.1 million kilowatt renewable energy project, aimed at enhancing energy delivery capabilities [1] - The construction team has adopted innovative solutions to overcome logistical challenges, such as building a small green grid to provide power sustainably [2][3] Group 2 - The project site experiences over 200 days of high wind speeds, complicating construction efforts and requiring careful planning to maximize operational days [3] - The successful implementation of renewable energy solutions in this challenging environment reflects China's commitment to modernizing its energy infrastructure and promoting green energy [3][4] - The transformation of the "Shagohuang" area into an energy oasis serves as a model for future renewable energy projects in similar environments [3]
戈壁生绿拼三劲(中国道路中国梦·每一个人都是主角)
Ren Min Ri Bao·2025-11-10 22:41