安立路实施快速化改造,回天地区将再添一条“高架走廊”
Xin Jing Bao·2025-11-12 05:18

Core Points - The Anli Road rapid transformation project aims to alleviate traffic congestion in the Huaitian area of northern Beijing, enhancing commuting efficiency for residents [1][4] - The project spans 14.9 kilometers, featuring seven mainline bridges and designed to meet urban expressway standards without traffic signals on the main road [2][4] Project Overview - The Anli Road rapid transformation project starts from Shuangying Road and extends to the Sixth Ring Road, with a total length of 14.9 kilometers, including 2.1 kilometers in Chaoyang District and 12.8 kilometers in Changping District [2][4] - The main road is designed for speeds of 60 km/h from Shuangying Road to Zhongdong Road and 80 km/h for the remaining sections, while the auxiliary road is designed for speeds of 40-50 km/h [2][4] - The project will significantly enhance spatial utilization and reduce traffic conflict points by increasing the level of vertical construction [2][4] Infrastructure Development - The project includes the construction of one major bridge and six large bridges, as well as two auxiliary bridges and five ramp bridges, ensuring efficient traffic flow across congested areas [6][5] - New municipal infrastructure, including rainwater, sewage, and water supply pipelines, will be integrated into the project to support sustainable urban development [6] Construction Progress - The project is currently in a rapid construction phase, with various construction materials and equipment being deployed as planned [7] - The construction team is addressing challenges related to balancing construction demands and local traffic needs, implementing multiple traffic diversions and enhancing safety measures [7]