Core Insights - E Ink, a global leader in electronic paper technology, has achieved LEED v4.1 Gold certification for its headquarters in Hsinchu, Taiwan, and its twin buildings FABVI & FABVII in Yangzhou, China, demonstrating a commitment to sustainable building practices [1][3]. Group 1: Sustainability Initiatives - The company is expanding its manufacturing capacity in response to increasing demand for electronic paper, reserving nearly 80,000 ping (approximately 264,000 square meters) for future operations, which is more than double its current production area [3]. - The Hsinchu headquarters, which began construction at the end of 2021 and is set to be completed by the end of 2024, is designed with energy efficiency and resource optimization as core goals, aligning with global net-zero carbon trends [3][4]. - The building incorporates high-efficiency design elements, including a central chilled water air conditioning system and smart lighting controls, achieving an overall energy savings rate of 26% [4]. Group 2: Water and Waste Management - The headquarters features a rainwater recycling system for irrigation, significantly reducing water consumption, and the lighting system adjusts based on natural light levels to enhance energy efficiency [4]. - During construction, the company adhered to green building principles, achieving a waste reuse rate of 75% for construction waste [4]. Group 3: Technological Integration - The headquarters utilizes energy-efficient electronic paper technology, enhancing meeting management with an electronic paper notebook reservation system and displaying real-time parking information on electronic paper billboards [5]. - The Yangzhou facility also received LEED certification, featuring high-insulation wall panels and low-emission glass, along with an energy monitoring platform that saves approximately 4.77 million kWh annually, equivalent to a reduction of 2,797 tons of carbon emissions [5][6]. Group 4: Renewable Energy and Local Sourcing - The Yangzhou plant has a self-sufficient solar power system with a capacity of 9.9 MW, generating about 11.8 million kWh of green electricity annually, which reduces carbon emissions by approximately 6,910 tons [6]. - The facility's construction phase achieved over 40% reduction in waste compared to LEED benchmarks, with a recycling rate of 82.1% for construction waste, and all major materials were sourced from nearby suppliers to minimize transportation emissions [6].
元太科技台湾与大陆新厂同步落实低碳营运承诺 双据点获LEED黄金级绿建筑认证
Sou Hu Cai Jing·2025-11-12 10:16