Core Insights - The T3 terminal at Xining Caojiabao International Airport has shown strong operational vitality since its opening on August 7, achieving a cumulative flight safety guarantee of 20,500 flights and a passenger throughput of 2.7 million, along with a cargo throughput of 12,800 tons in its first 100 days of operation [1][2] Group 1: Infrastructure and Capacity - The T3 terminal has a building area of 158,000 square meters, which is four times the total area of the previous T1 and T2 terminals, increasing the airport's annual passenger throughput capacity from 7 million to 21 million [1] - The number of parking positions has increased from 34 to 75, enabling the handling of large aircraft and resolving previous limitations on large aircraft takeoffs and landings [1] Group 2: Service and Design Features - The terminal incorporates various smart facilities and human-centered initiatives, including 80 check-in counters, 26 security check channels, and 43 self-service check-in devices to enhance passenger travel efficiency [2] - Unique design elements reflect the high-altitude region, with a roof inspired by the shape of the black-necked crane and a silver-white exterior simulating glacial landscapes, alongside thematic displays of local wildlife [2] Group 3: Route Network and Connectivity - The airport has opened over 100 routes, expanding to more than 70 cities, with a domestic network covering 17 high-frequency cities with more than five daily flights [2] - The Xining-Bangkok route has achieved regular operation, and the Xining-Xi'an-Hong Kong route is operated by wide-body aircraft, enhancing connectivity between Qinghai and key domestic and international cities [2][3] - The airport has set new records for daily and monthly passenger volumes, with peak daily flight numbers reaching 330 and passenger throughput hitting 46,000, representing increases of 17% and 14% respectively compared to peak days in 2024 [2]
西宁曹家堡机场T3航站楼投运百天 运输生产成果丰硕
Zhong Guo Min Hang Wang·2025-11-17 06:15