上港集团九江城西二期码头开港 区域航运再升级

Core Insights - The opening of the Jiangxi Province specialized roll-on/roll-off terminal by Shanghai Port Group enhances the shipping capabilities of the Yangtze River Economic Belt and supports the construction of the Jiujiang regional shipping center [1][3]. Infrastructure Development - The Jiangxi West City Phase II terminal includes a multi-purpose terminal with two 10,000-ton berths, a shoreline of 280 meters, and a land area of 186.05 acres, with an annual throughput capacity of 3.1 million tons [3]. - The roll-on/roll-off terminal features 1,300 parking spaces and one 600-space berth, with a shoreline of 323 meters and a land area of 297.3 acres, capable of handling 360,000 vehicles annually [3]. Construction Challenges and Innovations - The construction faced complex geological challenges, including thick rock layers and high cave occurrence rates, which were addressed through a full-process interleaved construction strategy and the use of BIM technology for precise simulation [3]. Strategic Importance - The terminal is part of Jiujiang's broader initiative to enhance its status as a key node in the Yangtze River Economic Belt, leveraging its unique position as Jiangxi's only port city with direct access to the sea [5]. - The operationalization of the terminal is expected to significantly improve Jiujiang's role as a shipping hub in the middle reaches of the Yangtze River, providing a more economical and efficient export route for advanced manufacturing in Jiangxi [5].