“钢铁巨无霸”5天驶向全球!山东蓬莱“码头直装”新模式→
Sou Hu Cai Jing·2025-11-22 07:49

Core Viewpoint - The new "dock direct loading" model developed in Penglai, Shandong, allows for the efficient export of oversized wind power equipment, overcoming previous transportation limitations and enhancing global market access [1][3][5]. Group 1: Export Efficiency - The "dock direct loading" model enables giant wind power foundations to be transported directly from the production site to the dock for shipping, eliminating road transport bottlenecks [3][5]. - Previously, the export of oversized equipment faced significant challenges due to high costs and logistical difficulties associated with road transport [5]. - The new model has reduced the loading time from 9 days to just 5 days, significantly increasing export efficiency [7]. Group 2: Industry Impact - The implementation of the new loading model allows companies to expand into larger and heavier marine wind power equipment sectors [7]. - Currently, 12 berths from three marine engineering companies in Penglai have been opened for external use, facilitating increased export capabilities [7].