天山铝业:关于140万吨电解铝绿色低碳能效提升项目首批电解槽通电投产的公告

Core Viewpoint - Tianshan Aluminum announced a green low-carbon energy efficiency upgrade project for its 1.4 million tons of electrolytic aluminum capacity, aligning with national energy-saving policies [1] Group 1: Project Details - The project will utilize advanced domestic electrolytic aluminum energy-saving technology and is located on the reserved site east of the Shihezi plant [1] - It involves the use of fully graphitized cathode carbon blocks and new energy-saving cathode structure technology, which offers high lining life, low resistivity, low sodium expansion rate, good thermal shock resistance, stable operation, and high current efficiency [1] - The project has been approved by the company's sixth board of directors' fifteenth meeting, and the first batch of electrolytic cells has begun energization [1] Group 2: Expected Outcomes - Upon completion, the company's electrolytic aluminum production capacity will reach the approved capacity of 1.4 million tons per year, with the comprehensive AC power consumption of aluminum liquid reaching industry-leading levels [1] - The project will rely on external green electricity as an energy guarantee, and once fully operational, the proportion of green electricity in the company's energy mix will further increase [1] - This upgrade is expected to enhance the company's competitive advantage in electricity costs and accelerate the green transformation of its electrolytic aluminum main business [1]