Core Insights - The Meizhou Pumped Storage Power Station Phase II project in Wuhua County has been fully commissioned, marking the first pumped storage project in the Guangdong-Hong Kong-Macao Greater Bay Area under the "14th Five-Year Plan" [1] - The total capacity of the Meizhou Pumped Storage Power Station has reached 2.4 million kilowatts, making it the strongest pumped storage power station in China in terms of clean energy absorption capacity, the highest level of domestic equipment manufacturing, and the largest market-oriented operational capacity [1] - Guangdong has six operational pumped storage power stations with a total installed capacity of 10.88 million kilowatts, becoming the first economic province in China to exceed 10 million kilowatts in operational pumped storage capacity [1] - Additionally, there are six pumped storage projects under construction with a total capacity of 7.4 million kilowatts, which are progressing rapidly [1]
梅州抽水蓄能电站全面投用 粤抽水蓄能在运规模突破1000万千瓦
Nan Fang Ri Bao Wang Luo Ban·2025-12-01 07:55