山东东营至青州高速公路改扩建项目全线通车运营

Core Viewpoint - The completion of the Dongqing Expressway project enhances regional connectivity and supports ecological protection and high-quality development in the Yellow River basin, with a total length of 88.7 kilometers and a design speed of 120 km/h [1] Group 1: Project Overview - The Dongqing Expressway runs from Dongying to Qingzhou, forming a crucial part of Shandong Province's highway network [1] - The project has been upgraded to a dual eight-lane highway, significantly increasing its capacity from 56,000 vehicles per day to 70,000-100,000 vehicles per day [3][4] Group 2: Traffic and Economic Impact - Since its opening in 2000, the expressway has experienced a surge in traffic, with daily traffic reaching 56,000 vehicles in 2019 and holiday peaks exceeding 102,000 vehicles [2] - The travel time between the Yellow River Estuary Ecological Tourism Area and Qingzhou Ancient City has been reduced from 3.5 hours to 2.5 hours, boosting tourist numbers and revenue [4] Group 3: Construction and Technological Innovations - The project utilized a "two-sided widening" approach and incorporated advanced construction techniques to address challenges posed by the unique geological conditions of the Yellow River Delta [5] - New technologies, such as full-section pavers and intelligent drainage systems, have been implemented to enhance road quality and safety [5] Group 4: Smart Upgrades and Service Enhancements - The expressway has undergone a smart upgrade with a cloud-based toll collection system, improving transaction times and overall service efficiency [6][7] - Innovations like self-service kiosks and a comprehensive service station have been introduced to enhance user experience and operational efficiency [7]

山东东营至青州高速公路改扩建项目全线通车运营 - Reportify