Core Insights - China's transportation construction sector has achieved significant breakthroughs in early December, showcasing its robust infrastructure capabilities and commitment to high-quality regional development [1] Group 1: Xiamen-Jinmen Bridge - The main tower of the Xiamen section of the Xiamen-Jinmen Bridge has been successfully capped with "millimeter-level" precision, marking a transition to the critical construction phase of cable-stayed bridge [2] - The Liu Wudian Navigation Bridge, part of the project, spans 1,948 meters with a main span of 928 meters and a tower height of 178.1 meters, constructed using 60 steel shell segments and two steel crossbeams [2] - The project team overcame significant technical challenges, achieving a deviation of only 0.5 parts per ten thousand, approximately 9 millimeters, through digital control and precision instruments [5] Group 2: Chongqing Jiangnan Tunnel - The Jiangnan Tunnel, a key project in Chongqing, has been completed and opened to traffic, significantly improving connectivity in the region [6] - The tunnel, which is 5.55 kilometers long and features six lanes, reduces travel time between the Nanping and Chayuan areas from 30 minutes to just 10 minutes [9] - The project faced geological challenges, including karst formations and water inflow, and was completed in 52 months [9] Group 3: Nanning-Pingxiang High-Speed Railway - The Nanning to Pingxiang high-speed railway is set to open on December 5, marking the full operation of the line and connecting Nanning with the border city of Pingxiang [10] - The railway spans 81 kilometers with a design speed of 250 kilometers per hour, allowing travel from Nanning to Pingxiang in just 75 minutes, a reduction of 178 minutes compared to conventional trains [12] - This railway enhances the connectivity of Guangxi's railway network and facilitates access to the China-Vietnam border [12]
中国经济UP↑丨速度与精度并重!超级工程筑牢区域发展“快车道”
Sou Hu Cai Jing·2025-12-03 13:27