Core Viewpoint - The "Spring Project" MiC (Modular Integrated Construction) marks a significant advancement in Guangzhou's construction industry, emphasizing the shift towards industrialized building methods and improved living quality [1][3]. Group 1: Project Overview - The "Spring Project" has a total construction area of approximately 160,000 square meters and is one of the first pilot projects for affordable housing under China's "Good Housing" initiative [3]. - The project includes a police station office building with a total area of about 2,000 square meters, designed as a four-story structure [3]. Group 2: Construction Methodology - The project employs a modular construction approach, with 90% of the work completed in the factory, achieving millimeter-level manufacturing precision [4]. - The construction process is designed to reduce on-site wet work by over 90%, decrease construction noise by 80%, and minimize construction waste by 70% [5]. Group 3: Technological Integration - The project utilizes a five-in-one model that incorporates standardized design, factory production, assembly construction, integrated decoration, and digital management, leveraging BIM technology for full professional collaboration [3][4]. - The innovative modular system allows for the building to be divided into 60 independent space modules, enhancing construction efficiency and quality stability [4].
像造汽车一样造房子! 模块化建造体系大幅提升建筑效率