Core Viewpoint - The housing selection event for the "Jinxiu Fendong" project in Taiyuan was conducted in a fair and transparent manner, with strict adherence to the established selection process [1][2] Group 1: Event Organization - The selection process was organized according to the "Taiyuan City Allocation-Type Affordable Housing Jinxiu Fendong Project Selection Process" [1] - The event took place from December 8 to December 13, lasting for six days, with specific time slots for selection each day [1] - The entire selection process was supervised by the Taiyuan City Southern Public Notary Office to ensure fairness and transparency [1] Group 2: Selection Process - Participants were required to sign in and verify their identities before being allowed to select housing [1] - The selection order was determined by a public lottery, and each family was assigned a unique sequence number for the selection process [1] - If a family did not arrive after three calls of their number, they were moved to the end of the selection list [1] Group 3: Facilities and Information - The event featured various zones including a sign-in area, waiting area, selection area, subscription area, and pre-review input area [1] - An electronic screen in the waiting area displayed the selection progress and remaining housing options [2] - A display board in the selection area provided detailed information on available housing, including building number, unit number, room number, area, sales price, and current status [2]
“锦绣汾东”项目正式选房
Sou Hu Cai Jing·2025-12-09 08:44