Core Viewpoint - The first snowfall of the winter significantly impacted operations at the Capital Airport, prompting an immediate response to ensure the smooth operation of flights during adverse weather conditions [1] Group 1: Operational Response - The Capital Airport activated a level one response mechanism in collaboration with BGS (Beijing Airport Ground Services Co., Ltd.) to address the challenges posed by the snowfall [1] - A total of 177 various support vehicles and nearly 600 professional personnel were deployed to manage the snow and ice removal operations [1] - BGS had 234 personnel on standby throughout the day, utilizing 24 de-icing vehicles for precise operations [1] Group 2: Resource Utilization - The operation involved the efficient application of 7,100 tons of de-icing fluid and 577 tons of snow-melting agents [1] - The team worked continuously for 10 hours to complete snow and ice removal for hundreds of flights, ensuring passenger travel was not disrupted [1] Group 3: Operational Details - The operations included a comprehensive approach, from de-icing aircraft surfaces to snow removal on runways, and managing cargo and baggage handling [1] - Ground staff were actively involved in monitoring and maintaining safety and efficiency throughout the operation, even in temperatures dropping to minus 4 degrees Celsius [1]
零下4℃,首都机场雪夜10小时护航百架次航班
Xin Jing Bao·2025-12-13 04:48