Core Viewpoint - Jinan Airport has effectively implemented emergency snow removal measures in response to the first snowfall of the winter season, ensuring the safety and smooth operation of flights while providing warm services to passengers during adverse weather conditions [1][8]. Group 1: Emergency Response and Coordination - Upon receiving snowfall forecasts, Jinan Airport activated its warning response, collaborating with air traffic control, meteorological departments, and airlines to conduct comprehensive drills and discussions [3]. - A "one snow, one plan" strategy was developed to assess the impact of snowfall and allocate resources effectively, enhancing operational organization during snow conditions [3]. Group 2: Operational Efficiency - As snow began to fall, all operational support departments at Jinan Airport entered a "wartime state," establishing a collaborative mechanism with air traffic control and airlines to optimize air traffic flow and expedite snow removal operations [3]. - Continuous monitoring of runway conditions and dynamic assessments were conducted to ensure safe takeoffs and landings for aircraft [5]. Group 3: Passenger Services - Jinan Airport enhanced its service by increasing check-in counters, improving flight information broadcasts, and providing dedicated assistance at key points such as check-in, security, and boarding [7]. - Special attention was given to vulnerable passenger groups, with staff providing guidance and distributing warm supplies like blankets and snacks [7]. Group 4: Preparedness and Training - The airport's effective response to winter weather challenges is attributed to comprehensive preparations, including refining emergency plans, equipment maintenance, personnel training, and practical drills [8]. - Specific training and assessments were conducted for snow removal equipment and operational staff to ensure readiness and effective collaboration during snow events [8]. Group 5: Performance Metrics - As of December 13, Jinan Airport mobilized approximately 2,000 personnel, utilized 530 vehicles, and sprayed 173 tons of de-icing fluid, maintaining orderly flight operations [8]. - The airport's proactive measures and commitment to safety and service exemplify its dedication to passenger welfare during winter travel [8].
济南机场完成今冬首场降雪保障工作
Zhong Guo Min Hang Wang·2025-12-13 09:46