罗赖马州将于2026年1月1日起并入巴西国家电力系统
Shang Wu Bu Wang Zhan·2025-12-17 16:44

Core Viewpoint - The integration of Roraima state into Brazil's National Interconnected System (SIN) will take effect on January 1, 2026, marking a significant development in the country's energy infrastructure [1] Group 1: Integration Details - Roraima is currently the only state in Brazil not connected to the SIN, relying on electricity imports from Venezuela and diesel-fired power plants [1] - The Brazilian National Electric Agency (ANEEL) announced that after the integration, the National Electric System Operator (ONS) will conduct a 30-day assessment of the system's operation [1] - Following the assessment, a timeline for the closure of local thermal power plants will be determined [1]