安徽香涧至鹭岛500千伏线路工程实现主体完工
Ren Min Wang·2025-12-18 01:52
Group 1 - Construction personnel are engaged in high-altitude operations at the Xiangjian to Luda Island 500 kV line project site [1][2]
Group 1 - Construction personnel are engaged in high-altitude operations at the Xiangjian to Luda Island 500 kV line project site [1][2]