沪渝蓉沿江高铁武宜段即将开通运营
CRCCCRCC(SH:601186) Xin Hua Wang·2025-12-25 08:17

Core Viewpoint - The Wuhan to Yichang section of the Shanghai-Chongqing-Chengdu High-Speed Railway will commence operations on December 26, enhancing the transportation network in the Yangtze River Economic Belt and promoting regional economic development [1][2]. Group 1: Project Overview - The Wuhan to Yichang section of the Shanghai-Chongqing-Chengdu High-Speed Railway spans 314 kilometers with a design speed of 350 kilometers per hour, significantly reducing travel time to 69 minutes between Wuhan and Yichang [1]. - The railway line connects key cities including Wuhan, Tianmen, Jingmen, and Yichang, and traverses complex geological conditions, including soft soil and fault zones [1]. Group 2: Construction and Engineering - Since its construction began in September 2021, the project has seen significant advancements, including the completion of major structures like the Zhongxiang Hanjiang Grand Bridge and the Baiguoshu No. 1 Tunnel [1]. - The Zhongxiang Hanjiang Grand Bridge, located in Jingmen, is notable for being the largest span concrete cable-stayed bridge for high-speed rail in China, with a main span of 270 meters [1]. Group 3: Strategic Importance - The Wuhan to Yichang section is a crucial part of China's "Eight Vertical and Eight Horizontal" high-speed rail network, linking existing and under-construction rail lines, thereby enhancing connectivity in the region [2]. - The opening of this section will create a dual-channel high-speed rail system between Wuhan and Yichang, optimizing the regional rail network and facilitating travel for local residents [2].