Core Viewpoint - The Ministry of Ecology and Environment has reported significant improvements in soil environmental quality since the "14th Five-Year Plan," effectively managing risks associated with soil pollution in construction land [1][3]. Group 1: Regulatory Measures - Strict management of contaminated land has been implemented, with over 2,630 sites included in the risk control and remediation list, and more than 1,220 sites have been remediated and removed from the list [3][4]. - The Zhejiang Hangzhou city has successfully completed the remediation of the Hangsteel Banshan base, freeing up 1.47 million square meters of land, which has stimulated over 20 billion yuan in fixed asset investment [3]. Group 2: Risk Management - A comprehensive risk management system has been established for retired land from enterprises, covering over 10,000 sites, with a focus on industries such as chemicals, coking, petroleum extraction, and non-ferrous metal mining [3][4]. - The Ministry has implemented a full-process risk control system that includes creating a list, key monitoring, and pollution control measures tailored to specific local conditions [3]. Group 3: Quality Improvement - The Ministry is enhancing regulatory quality through innovative management models and the establishment of a national soil environment management information system, ensuring traceability from assessment to remediation [4]. - A credit management system covering 60,000 practitioners has been established, with random checks on thousands of investigation reports to ensure quality in assessments and remediation efforts [4].
住得更安心!生态环境部:推动近万个企业腾退地块实施污染管控
2 1 Shi Ji Jing Ji Bao Dao·2025-12-26 09:46