Core Viewpoint - Liberia's new electricity strategy aims to achieve energy self-sufficiency by 2030 and potentially become an electricity exporter [2] Group 1: Electricity Strategy - The Liberia Electricity Corporation (LEC) announced a strategy to reduce dependence on electricity imports from Côte d'Ivoire and Guinea [2] - The strategy includes modernizing the Coffee Hill Hydropower Station in Monrovia, which involves repairing a turbine that has been out of service for four years [2] - With support from the World Bank, the modernization is expected to increase the station's capacity by 44 megawatts, enhancing the existing 66 megawatts of installed capacity [2] Group 2: Mission 300 Initiative - The government is implementing the "Mission 300" initiative, aiming to connect 100,000 new households and institutions to the grid [2] - This initiative plans for 60,000 to 70,000 connections to be grid-connected, while 30,000 to 40,000 will utilize off-grid renewable energy solutions [2] Group 3: Future Projections - By 2029-2030, Liberia's total domestic power generation capacity from hydropower, solar, and thermal sources is projected to reach approximately 500 megawatts [2] - This capacity is expected to meet the anticipated domestic demand of 400-500 megawatts, thereby reducing reliance on imported electricity and positioning Liberia as a potential regional electricity exporter [2]
利比里亚宣布新能源战略,目标2030年实现电力自给并有望出口
Shang Wu Bu Wang Zhan·2025-12-26 17:13