Core Viewpoint - The opening of the Tianshan Victory Tunnel marks the full operation of the G0711 highway, significantly reducing travel time and enhancing connectivity between northern and southern Xinjiang, thus facilitating economic, cultural, and human exchanges [3][4]. Infrastructure Development - The Urumqi-Yili Highway spans 324.7 kilometers and took over five years to complete, with the main line featuring a design speed of 120 km/h [4]. - The Tianshan Victory Tunnel, a critical component of the highway, is 22.13 kilometers long and has a maximum depth of over 1,112 meters, facing significant geological challenges during construction [4][6]. - Innovative construction methods reduced the expected construction time from 72 months to 52 months [6]. Economic Impact - Travel time between Urumqi and Korla has been halved from approximately 7 hours to 3.5 hours, enhancing accessibility for tourism and commerce [7]. - The highway is expected to boost the tourism industry by connecting major scenic areas, facilitating deeper tourism experiences [7]. - Local businesses, such as the Bayingolin Zhenxin Animal Husbandry Development Company, are already experiencing increased demand due to improved logistics, with transportation costs significantly reduced [9][10]. Logistics and Transportation - The highway's completion is anticipated to streamline logistics, allowing for faster delivery times and reduced costs for businesses, such as the Baizhou Wanjin Aquatic Products Company, which plans to double its production capacity [9][10]. - The establishment of new bus routes along the highway will cater to diverse travel needs, enhancing passenger transport efficiency [8]. Regional Development - The highway is expected to create a new regional development pattern by facilitating the flow of people, goods, and capital, thus promoting economic integration between northern and southern Xinjiang [10].
20分钟穿越天山,世界最长高速公路隧道通车
Ren Min Ri Bao·2025-12-27 01:49