宁德核电二期项目“应急柴油机厂房大模块”在南通开工

Group 1 - The Ningde Nuclear Power Phase II project has initiated the construction of the "Emergency Diesel Generator House Large Module" at Nantong Liebherr Heavy Industry Co., marking a new model of "factory-built plant" in China's nuclear power construction [1][3] - This project employs integrated large module technology for the first time in nuclear power construction, allowing for parallel completion of main construction and internal installation work, thereby reducing on-site workload and enhancing construction efficiency [3] - The large module adopts a "structure + system" integrated design concept, achieving a transition from single structural modules to deeply integrated modules, which is significant for improving safety levels and cost efficiency in nuclear power construction [3] Group 2 - The successful launch of this project is a key measure to ensure the high-level safety advancement of the Ningde Phase II project, contributing to the essential safety level and resource assurance for the new round of nuclear power construction [3] - Liebherr Group is recognized as a national high-tech enterprise and a "specialized, refined, distinctive, and innovative" small giant enterprise, with comprehensive capabilities in engineering design, EPC contracting, and modular research and manufacturing [3] - The total investment for the Nantong project is 5.5 billion yuan, focusing on the design, manufacturing, construction, and maintenance of large energy modules, aiming to establish a leading domestic and internationally competitive industrial module manufacturing base [3]

宁德核电二期项目“应急柴油机厂房大模块”在南通开工 - Reportify