“电港储运”一体化能源基地全容量投运 筑牢“万家灯火”能源保供根基
Yang Shi Wang·2025-12-28 03:15

Core Viewpoint - The successful commissioning of the No. 4 unit at Beihai Power Plant marks a significant advancement in energy supply capabilities for Guangxi, with the plant expected to meet a substantial portion of the region's electricity demand [1][3]. Group 1: Operational Performance - The No. 4 unit of Beihai Power Plant has completed a 168-hour full-load trial operation and is now in production [1]. - When all four units operate at full capacity, the plant can generate up to 96 million kilowatt-hours daily, fulfilling nearly one-seventh of Guangxi's average daily electricity demand [1]. - The annual power generation capacity of the plant exceeds 20 billion kilowatt-hours, supporting both industrial and residential electricity needs in Guangxi [1]. Group 2: Infrastructure and Logistics - With the commissioning of the No. 4 unit, Beihai Power Plant has established a comprehensive "electricity port storage and transportation" integrated energy base [3]. - The facility includes two 100,000-ton general-purpose berths capable of unloading global coal supplies, along with a coal storage yard with an annual capacity of 10 million tons [3]. - This integrated model of "port coal transportation, base coal storage, and unit coal burning" strengthens the foundation for energy supply security [3].

“电港储运”一体化能源基地全容量投运 筑牢“万家灯火”能源保供根基 - Reportify