新集能源:公司煤电项目的超超临界机组均具备深度调峰能力,其深度调峰能力可低至20%~30%

Group 1 - The company has confirmed that both its under-construction and operational coal power projects are capable of deep peak regulation, with the ability to operate at a minimum capacity of 20% to 30% [2]

XINJI ENERGY-新集能源:公司煤电项目的超超临界机组均具备深度调峰能力,其深度调峰能力可低至20%~30% - Reportify