重大工程→生态保护→生活品质提升 实干迎新 多视角解锁新年新气象
Yang Shi Wang·2026-01-02 04:11

Group 1 - The first phase of the Zhangzhou Nuclear Power "Hualong One" project has been completed and put into operation, with two units providing approximately 20 billion kilowatt-hours of clean electricity annually, equivalent to a reduction of about 16 million tons of carbon dioxide emissions [4] - The equipment localization rate of the Zhangzhou Nuclear Power Hualong One units has exceeded 90%, effectively promoting the transformation and upgrading of China's high-end equipment manufacturing industry [6] Group 2 - The first vacuum automatic mooring system in the country has been officially put into operation at Qingdao Port, enhancing the safety of mooring operations and significantly improving terminal operational efficiency [8] - The time required for single-ship mooring operations has been drastically reduced from 20-30 minutes to under 30 seconds, ensuring ships are securely fixed to the dock [10] Group 3 - The ten-year fishing ban on the Yangtze River, which started on January 1, 2021, has achieved significant results over the past five years, with the restoration of aquatic biodiversity showing positive trends [10][11] - The number of released fish exceeded 1 million for the first time in 2024, with 1.05 million expected in 2025, and the number of native fish species monitored in the Yangtze River basin has increased by 36 species compared to before the ban [13] - High-tech equipment such as fishing patrol boats, drones, and radar video has achieved full coverage of key water areas, with all 140,000 retrained fishermen employed and 220,000 eligible fishermen participating in pension insurance [16]