Group 1: Transportation Infrastructure - By the end of 2025, the total railway operating mileage in China is expected to reach 165,000 kilometers, with over 50,000 kilometers of high-speed rail, marking the largest and most advanced high-speed railway network in the world [2] - During the "14th Five-Year Plan" period, the total railway operating mileage will increase from 146,300 kilometers to 165,000 kilometers, representing a growth of 12.8%, while high-speed rail will grow from 37,900 kilometers to 50,400 kilometers, a growth of 32.98% [2] Group 2: Energy Sector - In 2025, the annual electricity transmission volume of the South Power Grid's "West-to-East Power Transmission" project is projected to reach 261.6 billion kilowatt-hours, a year-on-year increase of 9.8%, setting a new historical record [4] - The Guangdong-Hong Kong-Macao Greater Bay Area is experiencing robust growth in electricity demand due to the flourishing digital economy and advanced manufacturing, making Guangdong the first province in China to exceed an electricity load of 160 million kilowatts [4] Group 3: Oil and Gas Production - In 2025, the oil and gas production of the second oil production plant at the Changqing Oilfield in Gansu Qinyang is expected to exceed 4 million tons, setting a new historical high [6] - The second oil production plant has been enhancing technological innovation and applying horizontal well volume fracturing technology, resulting in an average daily output per well that is 3 times higher than conventional wells [6] - Since its development, the Qinyang gas field has produced a cumulative total of 2 billion cubic meters of natural gas, with a daily gas production of 2 million cubic meters, effectively meeting the gas needs of 2.6 million residents in the Qinyang old district [7]
“数”说亮眼成绩单 交通、能源等方面多个重大项目按下“加速键”
Yang Shi Wang·2026-01-04 16:14