国内首条!金川铜贵建成羰基尾料规模化处理生产线
Sou Hu Cai Jing·2026-01-07 02:44

Core Viewpoint - The completion of the "Carbonyl Tailings Platinum Group Metals Efficient Separation and Extraction Technology Industrialization Project" marks a significant breakthrough for Jinchuan Copper Precious Metals in the efficient recycling of precious metal resources and green low-carbon development, enhancing the strategic resource autonomy and modernization of the industrial chain [1][3]. Group 1 - The project is a major technological transformation initiative for Jinchuan Group in 2024, with a total investment of 127 million yuan, aimed at efficiently separating and extracting scarce platinum group metals from complex carbonyl tailings [3]. - The project commenced construction in September 2024 and was completed on December 28, 2025, overcoming core technical challenges in the recovery of platinum, palladium, rhodium, ruthenium, and iridium [3]. - The simultaneous construction of the "Precious Metal Flue Gas Centralized Treatment Project" represents a commitment to environmental sustainability, with a planned investment of 49.96 million yuan, starting in April 2025 and completing the main engineering by December [3]. Group 2 - During construction, the project faced technical challenges across metallurgy, construction, chemical, and electromechanical installation sectors, along with tight schedules and heavy tasks [5]. - The construction team demonstrated a strong sense of responsibility and mission, optimizing design plans and strictly controlling process quality to ensure high-quality completion on time [5]. - Jinchuan Copper Precious Metals aims to leverage the technological advantages of the new production line to become a benchmark for efficient resource recovery and green production in the industry, contributing to the group's goal of becoming a world-class enterprise [5].

国内首条!金川铜贵建成羰基尾料规模化处理生产线 - Reportify