Core Viewpoint - Zhejiang Energy Group achieved record-high power generation and energy supply in 2025, with a total power generation of 211.5 billion kWh, coal supply of 75.23 million tons, gas supply of 14.9 billion cubic meters, and heat supply of 138.16 million GJ, all showing year-on-year growth, demonstrating high-quality energy supply capabilities [1][3]. Group 1: Energy Supply Achievements - In 2025, Zhejiang Energy Group's total power generation reached 211.5 billion kWh, marking a historical high [1]. - The company completed nearly 5 million kW of new installed capacity, contributing to the energy supply stability and safety [3]. - The group successfully launched several major projects, including the expansion of existing power plants and the construction of new units, all designed to meet leading domestic standards for coal consumption and emissions [3]. Group 2: Operational Efficiency - During peak summer demand, Zhejiang Energy Group's power generation units played a crucial role in ensuring energy supply, effectively managing equipment reliability and load capacity [4]. - The company implemented a comprehensive management strategy to enhance equipment reliability and address output constraints, ensuring maximum generation capacity [4]. Group 3: Fuel Supply and Infrastructure - Zhejiang Energy Group's fuel supply strategy, supported by a complete industrial chain, ensured effective coal supply to power plants, achieving record throughput at its port facilities [6]. - The company met its annual targets for coal import and throughput, reaching 15 million tons and 30 million tons respectively, both setting new records [6]. Group 4: Natural Gas and Renewable Energy - The natural gas division established a comprehensive supply system, optimizing the energy structure and enhancing public welfare [9]. - The Wenzhou LNG receiving station set a record for peak output, ensuring sufficient supply during high-demand periods [9]. - The company is advancing its green transition by expanding renewable energy projects, achieving a twofold increase in renewable energy installed capacity compared to the end of the 13th Five-Year Plan [9]. Group 5: Winter Preparedness - As winter approaches, the company is focusing on detailed deployment across power generation, coal supply, gas supply, and heating to enhance supply capabilities and ensure stable energy for the public [10].
再创历史新高!2025年浙能实现高质量能源保供