Group 1 - The completion of the Yuan River Third Bridge significantly reduces travel time to the county vegetable market from 40 minutes to approximately 6 minutes, enhancing convenience for local farmers [1] - The bridge, measuring 411 meters in length and 18 meters in width, was initially stalled after the construction of two piers, causing local concern [1] - The local government has actively addressed the bridge's stalled construction by prioritizing it as a key project, with oversight from the municipal discipline inspection commission [2] Group 2 - The bridge's completion is expected by August 2025, alleviating traffic congestion during holidays and promoting the development of the surrounding vegetable industry [2] - Following the bridge's opening, the vegetable planting area in Matian Village increased by 20%, and prices rose by 10%, indicating a positive economic impact [2] - The local government has identified and is addressing multiple community projects, including road improvements and infrastructure upgrades, benefiting over 85,000 residents [2]
实践故事丨打通群众“连心桥”
Zhong Yang Ji Wei Guo Jia Jian Wei Wang Zhan·2026-01-13 00:33