Group 1 - The Pinggang Pump Station Phase II has commenced operation, significantly enhancing the water intake capacity to 3.6 million tons per day, which improves Zhuhai's ability to combat saline intrusion during dry periods [1] - The upgraded pump station allows for a three-day water supply from a single day's extraction, thereby increasing the reservoir's water source during critical times [1] - The establishment of a dual-core water intake system with the Pinggang and Zhuzhoutou pump stations creates a more stable and reliable water supply network for Zhuhai and Macau [1] Group 2 - Since 1960, Zhuhai has been responsible for supplying water to Macau, currently providing approximately 100 million cubic meters annually, which accounts for about 98% of Macau's actual water usage [2] - Since Macau's return to China, Zhuhai has supplied a total of 2.1 billion cubic meters of water, tripling the amount supplied before the return [2] - Future efforts will focus on "collaboration, construction, and operation" to ensure water supply safety and enhance strategic capabilities in the region [2]
珠海关键供水枢纽平岗泵站二期通水 大幅提升咸潮期城市“抢淡压咸”能力
Nan Fang Ri Bao Wang Luo Ban·2026-01-13 09:06