2026年我国首台核电机组开工建设
CNNPCNNP(SH:601985) Xin Hua Wang·2026-01-16 11:16

Core Viewpoint - The Jiangsu Xuwei Nuclear Energy Heating Power Plant has commenced the main construction phase with the concrete pouring of the nuclear island for its first unit, marking the first nuclear power unit to start construction in China this year [1]. Group 1: Project Overview - The Jiangsu Xuwei Nuclear Energy Heating Power Plant is a project under China National Nuclear Corporation (CNNC) that innovatively couples pressurized water reactors (PWR) with high-temperature gas-cooled reactors (HTGR) for heating and power generation [1]. - The project primarily focuses on industrial heating while also providing electricity, utilizing China's independently developed third-generation nuclear technology "Hualong One" and fourth-generation HTGR technology [1]. Group 2: Project Impact - Upon completion, the first phase of the project is expected to supply 32.5 million tons of industrial steam annually and generate over 11.5 billion kilowatt-hours of electricity, significantly reducing coal consumption by 7.26 million tons and cutting carbon dioxide emissions by 19.6 million tons [2]. - This project aims to support the large-scale supply of high-quality low-carbon industrial steam to the trillion-level petrochemical industry base in Lianyungang, providing reliable clean energy for the green transformation of the petrochemical industry in the Yangtze River Delta region [2]. Group 3: Broader Industry Context - The green and low-carbon transition of the energy structure is a crucial aspect of achieving carbon peak and carbon neutrality goals [2]. - CNNC currently operates 27 nuclear power units and has 18 units under construction or approved, with a total installed capacity of 46.859 million kilowatts, while also promoting comprehensive nuclear energy utilization in areas such as regional heating, industrial steam/cooling supply, seawater desalination, nuclear hydrogen production, and isotope production [2].

2026年我国首台核电机组开工建设 - Reportify