北京多部门合力保障雪后城市运行
Bei Jing Shang Bao·2026-01-18 15:11

Group 1 - The first snowfall of the year in Beijing occurred from January 17 to 18, prompting multiple departments to mobilize for snow removal and safety measures [1] - A total of 91,000 personnel were deployed for snow removal, including 46,000 professional workers and 45,000 from streets and towns, along with over 8,600 vehicles and 9,800 pieces of equipment [1][3] - The snow quality was fluffy, making it challenging to manage the volume, leading to strategies such as pushing clean snow into green spaces and compressing snow containing melting agents before removal [3] Group 2 - The Beijing Public Transport Group implemented a special driving plan to monitor passenger flow in real-time, focusing on commuting corridors and major residential areas [4] - Increased transport capacity was allocated to areas with high passenger density, utilizing flexible scheduling methods to enhance route efficiency [4] - Safety measures included deploying over 1,000 management personnel at 507 safety service points and ensuring all operational vehicles had heating systems activated for passenger comfort [4]

北京多部门合力保障雪后城市运行 - Reportify