Group 1 - The core point of the article is that GAC Group's chairman, Feng Xingya, visited Gree Electric, leading to rumors about Gree supplying half of GAC's automotive chips, which GAC officially denied [2] - GAC Group emphasized that the visit was to discuss the integration of "people, vehicles, and home" and explore industrial collaboration, and any future cooperation details will be announced through official channels [2] - Gree Electric has been expanding its capabilities in chip design and production, establishing an IPM power module production line in 2010 and launching a silicon carbide chip factory in 2022, with plans for significant production capacity by 2025 [3] Group 2 - Gree Electric's silicon carbide chip factory is expected to have an annual production capacity of 240,000 pieces of 6-inch silicon carbide wafers by the end of 2023 [3] - By 2025, Gree Electric anticipates cumulative sales of over 300 million chips [3]
未来汽车芯片半数将由格力替代?广汽集团紧急回应