再见“老朋友”,你好“新朋友” 广州白云边检站全力护航T1航站楼国际区域“转场”T3航站楼
Zhong Guo Min Hang Wang·2026-01-22 11:11

Core Viewpoint - The official opening of the international area of T3 terminal at Guangzhou Baiyun International Airport marks a significant upgrade in the airport's capacity and efficiency for handling international flights, enhancing the overall travel experience for passengers [1][10]. Group 1: Terminal Transition - The international flight K6668 from Phnom Penh to Guangzhou signifies the operational commencement of the T3 terminal's international section [1]. - The transition involved meticulous planning, with the Baiyun border inspection station preparing for two months, creating six special guarantee plans, and conducting seven full-process drills to ensure a smooth transition [6][10]. - The T1 terminal's international area concluded operations with the last inbound flight on January 22, 2023, after serving over 46.3 million passengers and 420,000 flights in the past five years [8][9]. Group 2: Enhanced Facilities and Services - The T3 terminal features a modernized inspection hall with 24 outbound and 22 inbound manual channels, and 15 fast-track channels, accommodating 1,200 and 1,500 people simultaneously, respectively [10]. - The new terminal incorporates advanced technology, including a smart verification platform with height-adjustable biometric data collection devices, reducing processing time for disabled passengers by 60% [11]. - The introduction of a 360-degree detection system enhances the identification of special targets, achieving an accuracy rate of 99.99% [11]. Group 3: Passenger Experience - Passengers have reported a significantly improved experience at the T3 terminal, highlighting the clarity of the guidance provided and the overall convenience of the new facilities [10][11]. - The Baiyun border inspection station aims to continue enhancing the travel experience while maintaining security, contributing to the high-quality development of the Guangdong-Hong Kong-Macao Greater Bay Area [11].