“十四五”时期水利基础设施建设全面提速 淮河流域新增水库库容二十五亿立方米
Ren Min Ri Bao·2026-01-27 01:21

Group 1 - The core viewpoint of the article highlights the significant investment and progress in water management and infrastructure in the Huai River basin during the 14th Five-Year Plan period, with a total investment of 606 billion yuan, which is 1.63 times that of the previous five-year period [1] - By the end of the 14th Five-Year Plan, all 38 projects identified by the State Council for further management of the Huai River have commenced, with 17 projects completed and accepted [1] - The capacity of newly constructed reservoirs in the basin has increased by 2.5 billion cubic meters, with flood control capacity reaching 1.09 billion cubic meters, enhancing the flood control engineering system [1] Group 2 - The evaluation of river and lake health in the Huai River basin has been fully completed, achieving the revival goals for nine major rivers and lakes, and establishing over 2,200 happiness rivers and lakes at various administrative levels [1] - Water resource utilization has been effectively controlled, with total water usage maintained within 72.4 billion cubic meters, and groundwater extraction reduced by over 15% compared to the end of the 13th Five-Year Plan [2] - The effective utilization coefficient of irrigation water in farmland has reached 0.609, with water consumption per unit of GDP and industrial added value significantly better than the national average [2]

“十四五”时期水利基础设施建设全面提速 淮河流域新增水库库容二十五亿立方米 - Reportify