国轩高科:0.2GWh全固态电池中试产线已于2025年上半年完成并投产
Group 1 - The company Guoxuan High-Tech (002074) has completed the pilot production line for 0.2GWh all-solid-state batteries, which is set to be operational in the first half of 2025 [1] - The design work for the 2GWh mass production line is progressing as planned [1]