江苏V2G最大放电功率突破1万千瓦 协鑫能科联手蔚来6座换电站贡献15%

Core Viewpoint - The successful completion of the V2G (Vehicle-to-Grid) concentrated discharge test in Jiangsu Province demonstrates significant advancements in energy management and collaboration between companies like GCL-Poly Energy and NIO [1] Group 1: V2G Test Results - The maximum discharge power achieved during the test exceeded 10,306 kilowatts [1] - GCL-Poly Energy and NIO's collaboration on six V2G-enabled battery swap stations in Nanjing contributed significantly, with a maximum discharge power of 1,539.85 kilowatts, accounting for 15% of the total discharge power in the province [1] Group 2: Future Developments - GCL-Poly Energy and NIO are set to connect three additional V2G stations in Wuxi and Suzhou, expanding the total to 12 stations in the Yangtze River Delta core city cluster [1] - The companies plan to continue expanding the coverage and collaboration scope of the vehicle-to-grid interaction [1]

GCLET-江苏V2G最大放电功率突破1万千瓦 协鑫能科联手蔚来6座换电站贡献15% - Reportify