Core Viewpoint - China General Nuclear Power Group (CGN) reported significant growth in clean energy capacity during the 14th Five-Year Plan, with operational installed capacity increasing from 62 million kilowatts to 113 million kilowatts, and domestic renewable energy capacity surpassing 70 million kilowatts [1] Group 1: Nuclear Power Development - During the 14th Five-Year Plan, CGN received approval for 16 nuclear power units, started construction on 10 units, and completed 4 units [1] - As of now, CGN operates 28 nuclear power units and has 20 units under construction, with a total installed capacity exceeding 56 million kilowatts [1] Group 2: Clean Energy Impact - Over the past five years, CGN's cumulative electricity generation exceeded 1.67 trillion kilowatt-hours, equivalent to a reduction of 510 million tons of standard coal consumption, which is comparable to planting 3.75 million hectares of forest [1] - In the renewable energy sector, CGN's domestic operational installed capacity nearly tripled compared to the end of the 13th Five-Year Plan, surpassing 70 million kilowatts, with cumulative electricity generation exceeding 370 billion kilowatt-hours and a renewable energy equipment utilization rate maintained above 99% [1]
中广核在运装机容量突破1.1亿千瓦