Core Viewpoint - The construction of the Xiamen-Kinmen Bridge is progressing rapidly, with innovative techniques being employed to enhance efficiency and minimize environmental impact. The project is part of a broader initiative to strengthen cross-strait cooperation and infrastructure development between Fujian and Taiwan [1][2]. Group 1: Project Overview - The Xiamen-Kinmen Bridge (Xiamen section) officially commenced construction at the end of 2023, following the release of a policy aimed at exploring new paths for cross-strait integration and development [1]. - The bridge's main tower has recently been completed, marking a significant milestone in the construction process [1]. Group 2: Construction Techniques - The project utilizes a rebar-free steel shell concrete composite structure, which reduces on-site workload and improves construction efficiency [2]. - The non-navigation hole bridge construction employs prefabricated assembly techniques, significantly reducing disturbances to the marine environment and protecting marine life habitats [2]. Group 3: Construction Progress and Challenges - The construction team is focused on achieving the goal of having the main line operational by the end of this year, with significant milestones such as the completion of the guiding cable installation for the Liu Wudian Channel Bridge recently achieved [3]. - The construction of the bridge's main tower involves lifting heavy steel shells, weighing up to 155 tons, which requires precise technical execution and psychological resilience from the operators [3].
00后在海峡“搭积木”(新春走基层)
Ren Min Ri Bao·2026-02-14 00:51