新春走基层|“磨轨小分队”寒夜火花点亮万家灯火
Zhong Guo Jing Ying Bao·2026-02-25 06:48

Core Viewpoint - The article highlights the critical role of the "rail grinding team" during the Spring Festival, emphasizing their efforts to ensure the safety and smooth operation of high-speed railways in China during peak travel times [1][3]. Group 1: Operations and Responsibilities - The "rail grinding team" is responsible for the grinding operations of railway tracks in Jiangxi and Fujian provinces, ensuring that any wear and tear on the tracks is addressed promptly to maintain passenger safety and comfort [1]. - The grinding process is likened to a precise surgical operation, requiring adjustments in angle and pressure to keep the grinding precision within 0.1 millimeters [1][3]. - The team operates at night, with 96 grinding wheels simultaneously in action, producing bright sparks as they work on the tracks [2]. Group 2: Working Conditions and Team Commitment - The team consists of 20 members, with 7 individuals choosing to work during the Spring Festival, showcasing their dedication to maintaining railway safety during this busy travel period [3]. - The working environment is challenging, with low temperatures and the need for meticulous cleaning of metal dust to prevent equipment malfunctions [2]. - The team receives support from their workplace, such as a special meal on New Year's Eve, to foster a sense of community and warmth during the holiday season [3].

新春走基层|“磨轨小分队”寒夜火花点亮万家灯火 - Reportify