节日能源供应“不断线”
Ren Min Wang·2026-02-26 05:55

Core Insights - The article highlights the efficient and automated operations at the Yanzhou Coal Mining Group's Dongping Lu Port, showcasing its advanced technology and logistics capabilities during the Spring Festival period [1][6]. Group 1: Operational Efficiency - The Dongping Lu Port utilizes automated loading equipment, allowing for a single ship loading capacity of approximately 2,000 tons to be completed in just one hour, ensuring timely delivery to the Jiujiang Power Plant [3][6]. - The port plans to handle around 70,000 tons of coal during the Spring Festival holiday, with a monthly stable shipment of over 20,000 tons to support downstream power generation [3][6]. Group 2: Logistics and Transportation - The port has optimized its multi-modal transportation system, focusing on the urgent needs for electricity and coal during the Spring Festival, with a dual transport plan for efficient coal distribution [6][7]. - The port's daily maximum loading capacity can exceed 40,000 tons during peak periods, demonstrating its robust operational capabilities [6][7]. Group 3: Technological Advancements - The port's static coal storage capacity has been enhanced to 2 million tons, and key equipment operates without human supervision, increasing production efficiency by 60% and reducing labor by 300 workers compared to similar ports [7]. - The implementation of a real-time matching mechanism for vehicles, ships, and cargo has halved waiting times for vessels, while the new "direct loading" model has reduced coal turnover cycles to under 48 hours [7]. Group 4: Environmental Initiatives - The port has achieved a green energy usage rate of 45%, resulting in a carbon reduction of 5,000 tons annually, and has been recognized as a "provincial zero-carbon park" candidate [7].

节日能源供应“不断线” - Reportify