Core Viewpoint - The company is currently managing challenges posed by increased rainfall during the rainy season in Fiji, but has implemented measures to ensure that production operations at the Vatukoula gold mine remain unaffected [1] Group 1: Production Operations - The rainy season has led to increased rainfall, which presents challenges for the production operations at the Vatukoula gold mine [1] - The company has deployed comprehensive measures in advance to address these challenges, ensuring that operations have not been impacted by the rainy season [1] Group 2: Mine Management and Upgrades - The company is committed to strengthening monitoring and management during the rainy season to ensure the safe operation of the mine [1] - The technical upgrade work at the Vatukoula gold mine is progressing as planned, with completion expected by the end of 2026 [1] - The daily processing capacity of tailings at the Vatukoula gold mine has stabilized at 1,300 tons, while the daily processing of ore is approximately 1,000 tons [1] - Relevant updates regarding the technical upgrades will be disclosed in the company's 2025 annual report as required [1]
招金黄金:目前雨季对生产经营未造成影响