X @Elon Musk
Project Overview - Chile's first utility-scale Megapack project is underway [1] - The project has a capacity of 225 MW (Megawatts) / 900 MWh (Megawatt-hours) [1] Technology and Manufacturing - The Megapacks are manufactured in Tesla's Shanghai Megafactory [1] Grid Impact - The system strengthens grid stability and supports the growing solar penetration in the region [1] Location - The project is located at @ColbunEnergia Celda Solar in the Atacama Desert [1]