X @Herbert Ong
🚨 Cortex 2.0 at Giga Texas is ramping fastMegapack capacity is set to nearly double (~130 → ~260 units), while the on-site substation and power delivery are expanding to support ~500 MW of AI compute.Cooling systems are already being tested, and initial operation is still expected this month, with full build-out continuing through summer.This is critical infrastructure for scaling Optimus production and Tesla’s AI ambitions. $TSLAJoe Tegtmeyer 🚀 🤠🛸😎 (@JoeTegtmeyer):Cortex 2.0 at Giga Texas continues constru ...