Core Viewpoint - The article discusses the procurement announcement for the 200MW/800MWh independent energy storage project located in Tianpishan Industrial Park, Inner Mongolia, which is planned to be completed and operational by 2025 [1][3]. Project Overview - The project involves the construction of a non-walk-in liquid-cooled lithium iron phosphate energy storage system with a capacity of 200MW and an energy storage capacity of 800MWh [3][4]. - The project site is situated in a flat alluvial plain with convenient external transportation access, including proximity to major highways [3]. Procurement Details - The procurement is organized by China Energy Conservation and Environmental Protection Group Co., Ltd. and invites qualified bidders to participate [2][3]. - The procurement method is open bidding, and the deadline for bid submission is set for July 7, 2025 [17]. Technical Specifications - The energy storage system must include a battery capacity of no less than 800MWh and must be equipped with a five-year warranty [4]. - The project requires bidders to have capabilities in the independent research and production of at least three types of products related to energy storage systems [12]. Bidder Qualifications - Bidders must be legally registered entities in China with independent legal status and must not be under any bankruptcy or administrative penalties [6][7]. - Financial requirements include providing audited financial reports for the past three years and demonstrating relevant project experience in energy storage [9][10]. Submission and Opening Procedures - Bidders must register on the electronic procurement platform to obtain bidding documents and submit their bids online [16][19]. - The opening of bids will occur online, and bidders must use a digital certificate for participation [17][18].
200MW/800MWh!中节能内蒙古乌兰察布独立储能设备采购