Workflow
1.197元/Wh!中车株机预中标河南平顶山100MW/400MWh独立储能电站项目EPC

Group 1 - The core viewpoint of the article highlights the bidding results for the 100MW/400MWh independent shared energy storage project in Pingdingshan, with the first candidate being CRRC Zhuzhou Electric Locomotive Co., Ltd. at a bid price of 478.88 million yuan, equivalent to 1.197 yuan/Wh [1] - The second candidate is Hunan Industrial Equipment Installation Co., Ltd. with a bid price of 492.32 million yuan, equivalent to 1.231 yuan/Wh [1] - The third candidate is Hunan Xinya Lin Engineering Technology Co., Ltd. with a bid price of 488.80 million yuan, equivalent to 1.222 yuan/Wh [1] Group 2 - The project is commissioned by Pingdingshan Hengzhan New Energy Co., Ltd. and is located in Pingdingshan, Henan Province [1] - The energy storage project utilizes lithium iron phosphate batteries, with an outdoor container layout for the battery system and power conversion system [1] - The project includes a 120MVA (110/35kV) booster transformer and employs a ring network connection between storage units, connecting to a 35kV distribution device [1]