Workflow
25家竞标,报价0.3931-0.52元/Wh!内蒙古能源5.2GWh储能系统中标候选人公示

Core Viewpoint - The article discusses the procurement results for independent energy storage projects in Inner Mongolia, highlighting the winning bidders and their respective bid prices for three project segments [2][3]. Group 1: Project Overview - The projects include the 500MW/2GWh independent energy storage project in Hohhot, the 400MW/1.6GWh project in Dengkou County, and the 400MW/1.6GWh project in Balinzuoqi, Inner Mongolia [2][6]. - The total number of participating companies in the bidding was 25, with bid prices ranging from 0.3931 to 0.52 yuan/Wh [3]. Group 2: Winning Bidders and Bid Prices - For Segment 1 (Hohhot project), the winning bidders and their bid prices were: - CRRC Zhuzhou Electric Locomotive Research Institute: 792 million yuan, 0.396 yuan/Wh - BYD Auto Industry: 796 million yuan, 0.398 yuan/Wh - Shandong Electric Era Energy Technology: 797.6 million yuan, 0.399 yuan/Wh [5][6]. - For Segment 2 (Dengkou project), the winning bidders and their bid prices were: - BYD Auto Industry: 628.43 million yuan, 0.393 yuan/Wh - Shandong Electric Era Energy Technology: 636.1 million yuan, 0.398 yuan/Wh - Dongfang Electric Automatic Control Engineering: 627.295 million yuan, 0.392 yuan/Wh [5][6]. - For Segment 3 (Balinzuoqi project), the winning bidders and their bid prices were: - Shandong Electric Era Energy Technology: 638.1 million yuan, 0.399 yuan/Wh - Dongfang Electric Automatic Control Engineering: 628.95237 million yuan, 0.393 yuan/Wh - Xuchang XJ Electric Technology: 643.912 million yuan, 0.402 yuan/Wh [5][6]. Group 3: Bid Evaluation and Qualifications - The winning bidders met the qualification requirements, including having the necessary research and manufacturing capabilities for core products such as PCS and BMS, and holding ISO 9001 quality management system certification [7][8]. - The evaluation process ensured that if a bidder was selected as the first candidate for multiple segments, they would only be recommended for the segment with the highest priority [2][3].