Workflow
百兆瓦时级!全球首座,完成验收

Core Viewpoint - The successful acceptance of the 50 MW / 100 MWh digital energy storage demonstration project marks a significant advancement in China's digital storage technology, transitioning from research to large-scale engineering application [1]. Group 1: Project Overview - The digital energy storage demonstration project is the world's first 100 MWh level digital storage station, located in Inner Mongolia [1]. - The project was led by the China Three Gorges Corporation and involved collaboration with Tsinghua University, consisting of 46 storage containers with capacities of 1.075 MW / 2.15 MWh [3]. Group 2: Technological Innovations - The project features a digital energy exchange system, a digital storage integration system, and an energy management and intelligent operation and maintenance platform, enabling millisecond-level dynamic switching [3]. - The innovative battery network structure allows for flexible and dynamic reconfiguration, supporting low-cost and long-life digital storage technology [3]. Group 3: Integration with Renewable Energy - The project is part of the Three Gorges Ulanqab New Generation Green Friendly Power Station, which has a total installed capacity of 2 million kW and includes 550,000 kW of electrochemical storage [5]. - The station demonstrates an integrated operation of wind, solar, and storage, enhancing the flexibility of the power grid and improving the consumption of clean energy in the region [5].