低至0.7139元/Wh!五粮液储能项目第二次开标
WLYWLY(SZ:000858) 鑫椤储能·2026-01-22 06:52

Core Viewpoint - The article discusses the second bidding results for the EPC (Engineering, Procurement, and Construction) contract of the Wuliangye Industrial Park energy storage station project, highlighting the competitive pricing and the details of the bidding process [1][2]. Bidding Results - The bidding participants included several joint ventures and companies, with bid prices ranging from 0.7139 to 0.7318 yuan/Wh [1][2]. - The specific bids were as follows: - China Railway Eight Bureau Group and Sichuan Electric Power Design Institute: 0.7289 yuan/Wh - China State Construction Engineering Corporation and China State Construction Zhonghuan New Energy: 0.7234 yuan/Wh - China Railway Eleventh Bureau Group and Zhongzhuan Engineering Design: 0.7318 yuan/Wh - Sichuan Yineda Construction Engineering: 0.7139 yuan/Wh - Kuai Bu Times (Fujian) New Energy Technology and Zhongtu Design: 0.7313 yuan/Wh - Zhongzhou Hanyuan Construction: 0.7285 yuan/Wh [2]. Project Scope - The project involves the construction of a 10MW/20MWh energy storage station, including design, equipment supply, installation, and related administrative procedures [3]. - The scope includes the procurement of two battery cabins, two energy storage conversion and boosting units, and various systems for energy management and safety [3]. Operational Requirements - The energy storage station will require operation and maintenance services for a minimum of two years after commissioning [4]. - The project has a total investment of 16 million yuan, with a construction period of 90 calendar days [3]. Previous Bidding Attempt - The project previously failed to attract enough bidders, resulting in a failed bid due to fewer than three submissions [5][6].